13. Monument to a Missing Island

The left and right columns were assembled first, as they are more stable and will anchor the piece on site. After assembling all of the column sections, threaded steel rods were run through the work. Working from the bottom up, the sections were drilled out bolted tightly down every four sections until a solid column was formed.