8: 30 in the morning, the little excavator made 9 deep holes in an hour
18th, Got 30 of 80 lbs concrete mix pack delivered it to the site and started burring the base wood with concrete.
19th, I knew that it is gonna be raining because I just did concrete work yesterday.
When I went to the site every hole has enough water to work on, so what?. I prepared some cooking pot
with long handle and dumping the water out. I did fill the soil back to flat it down