17th, Digging started

8: 30 in the morning, the little excavator made 9 deep holes in an hour

18th, Got 30 of 80 lbs concrete mix pack delivered it to the site and started burring the base wood with concrete.

19th, I knew that it is gonna be raining because I just did concrete work yesterday.

         When I went to the site every hole has enough water to work on, so what?. I prepared some cooking pot

        with long handle and dumping the water out. I did fill the soil back to flat it down