This week has seen progression in the building of the bench and armature structures for Etherwave Architecture #1. Lots of designing, measuring, cutting, grinding, welding, and more grinding. Everything has to be built in sections to fit in elevators and reassembled on site, which sits directly between the Hell Gate and RFK bridges on the park's waterfront.
Images:
