8:00 AM I arrived, met Deb and Fin, and we started drilling out the holes. 8 holes, 3 ft deep x 1 ft diameter, with two being "long holes": 1 ft wide x 2 ft long. Cleaned up the holes with shovels.
9:20 AM Mike arrived with sonotubes. We widened some of the holes and inserted the sonotubes.
10:00 AM Eric and Chris arrived with the sculptures. We started putting them in their respective holes, staking them, and wrapping plastic around the bottom to protect from concrete splashes.
10:45 AM Concrete truck arrived. Mike and Eric started filling holes while Chris and I continued to place and stake them. Cleaned up the concrete a little.
12:15 AM Concrete truck left. Cleaned the wheelbarrows and shovels, gathered tools. Ate lunch.